1 of 7: GRP walkway
2 of 7:
3 of 7:
4 of 7:
5 of 7:
6 of 7: PR&D Building Location: Macclesfield, Cheshire Client: AstraZeneca Developer: AstraZeneca
7 of 7: PR&D Building Location: Macclesfield, Cheshire Client: AstraZeneca Developer: AstraZeneca

Link walkway

Millfield were requested to assist with the design of a link walkway on a large Pharmaceutical site. The main criteria, being the speed of completion on site. Installation took place over a weekend.

The walkway was fully commissioned for use on the Monday morning

The link walkway was manufactured as a plug and play unit prefabricated at the Newburn facility. The integration of the steel framework, aluminium glazing panels, internal paneling and electrical installations were carried out at Millfield’s premises.

The wagons delivered three units to site on day one, on day two it was handed to the client fully operational.

The walkway forms a seamless link between two units blending in with the architectural features of the buildings.

Back to GRP case studies

Click on the PDF below to download the data sheet:

CASE STUDY Link Walkway
759.1 KB